Difference between revisions of "Shared:2023W4G2Presentations"

From cs
Jump to: navigation, search
(Week2)
(Week2)
Line 45: Line 45:
 
[[File:ESA_figure_5.png|850px]]
 
[[File:ESA_figure_5.png|850px]]
 
Reference research: Underground rhizomatic structure with skylights, Rhizome 1.0  
 
Reference research: Underground rhizomatic structure with skylights, Rhizome 1.0  
Using regolith-based concrete that can be produced via In-Situ Resource Utilisation (ISRU).[http://cs.roboticbuilding.eu/index.php/2019MSc3]
+
[http://cs.roboticbuilding.eu/index.php/2019MSc3]
 +
 
 +
Using regolith-based concrete that can be produced via In-Situ Resource Utilisation (ISRU).
  
  

Revision as of 10:55, 24 February 2023


Header Group2 test.png


Group 2: Mohammad Behboodi - Sumeet Joshi - Dost Sahingoz - Majd Shahoud


CV

HRI

Presentations



Week2

Presentation 24-02-2022


AR0122-IAPW-2023 Group2 Week2 ConceptPresentation 1.png


ESA figure 5.png Reference research: Underground rhizomatic structure with skylights, Rhizome 1.0 [1]

Using regolith-based concrete that can be produced via In-Situ Resource Utilisation (ISRU).


AR0122-IAPW-2023 Group2 Week2 ConceptPresentation 2.png


AR0122-IAPW-2023 Group2 Week2 ConceptPresentation 3.png


AR0122-IAPW-2023 Group2 Week2 ConceptPresentation 4.png

AR0122-IAPW-2023 Group2 Week2 ConceptPresentation 5.png




Week3

-