Difference between revisions of "Shared:2023W4G1Report"

From cs
Jump to: navigation, search
 
(3 intermediate revisions by 2 users not shown)
Line 39: Line 39:
 
<br>
 
<br>
 
<br>
 
<br>
'''''HRI REPORT'''''
+
'''''GROUP 1 FINAL REPORT'''''
 
<br>
 
<br>
 +
<br>
 +
The below report provides a comprehensive summary of our process in producing the Martian Habitat, including the design process, prototyping, experimentation as well as some of the relevant references that inspired and influenced our design.
 +
<br>
 +
<br>
 +
 
<html>
 
<html>
 
   <head>
 
   <head>
 
   </head>
 
   </head>
 
   <body>
 
   <body>
     <iframe src="http://cs.roboticbuilding.eu/images/2/27/Report_group_1.pdf" width="100%" height="500px">
+
     <iframe src="http://cs.roboticbuilding.eu/images/3/3e/Group_1_Report_V2.pdf" width="100%" height="500px">
 
     </iframe>
 
     </iframe>
 
   </body>
 
   </body>
Line 52: Line 57:
 
<br>
 
<br>
  
<br>
 
'''Sources'''
 
<br>
 
Images Mars, Nasa
 
<br>
 
<br>
 
 
<br>
 
<br>

Latest revision as of 15:47, 30 April 2023




MARS HABITAT



Prototype water research station for the human endeavour of discovering water on Mars.
Group 1 Arno Decorte - Tom Punte - Augusta Fiseryte


CV

HRI

REPORT






GROUP 1 FINAL REPORT

The below report provides a comprehensive summary of our process in producing the Martian Habitat, including the design process, prototyping, experimentation as well as some of the relevant references that inspired and influenced our design.