Difference between revisions of "W4SCHEDULE"
From cs
(Created page with " =='''SCHEDULE'''== <br>'''1st day:''' <br>a. Introduction to D2RO and design brief. <br>b. Design challenge, development and identification of intervention context, conceptu...") |
(No difference)
|
Revision as of 13:21, 8 May 2018
SCHEDULE
1st day:
a. Introduction to D2RO and design brief.
b. Design challenge, development and identification of intervention context, conceptualization of mechatronic systems within provided geometry.
2nd day:
a. Set-up of RPiWZ nodes; development and implementation of Sensor / Actuator systems pertaining to proposed intervention solution.
b. Test-drive of mechatronic systems and debugging.
c. Installation of required Python libraries for subsequent WSAN integration and operation, and integration of all RPiWZ nodes into a unified WSAN, where any node is able to access the information gathered by any other node.
3rd day:
a. Preparation of presentation.
b. Final review.